HB 2402 — An Act providing for the capital budget for fiscal year 2026-2027; itemizing public improvement projects, furniture and equipment projects, transportation assistance, flood control projects, Pennsylvania Fish and Boat Commission projects and Manufacturing Fund projects leased or assisted by the Department of General Services and other State agencies, together with their estimated financial costs; authorizing the incurring of debt without the approval of the electors for the purpose of financing the projects to be constructed, acquired or assisted by the Department of General Services and other State agencies; authorizing the use of current revenue for the purpose of financing the projects to be constructed, acquired or assisted by the Department of General Services and other State agencies stating the estimated useful life of the projects; and making appropriations.
Congress · introduced 2026-03-24
Latest action: — Re-committed to APPROPRIATIONS, April 15, 2026
Sponsors
- Jordan A. Harris (D, PA-186) — sponsor · 2026-03-24
Action timeline
- · house — Referred to APPROPRIATIONS, March 24, 2026
- · house — Reported as committed, March 25, 2026
- · house — First consideration, March 25, 2026
- · house — Laid on the table, March 25, 2026
- · house — Removed from table, April 14, 2026
- · house — Second consideration, April 15, 2026
- · house — Re-committed to APPROPRIATIONS, April 15, 2026
Text versions
No text versions on file yet — same ingest as the action timeline populates these. Each version has direct links to the XML / HTML / PDF at govinfo.gov.
Bill text
Printer's No. 3078 · 491,632 characters · source document
Read the full text
PRINTER'S NO. 3078
THE GENERAL ASSEMBLY OF PENNSYLVANIA
HOUSE BILL
No. 2402
Session of
2026
INTRODUCED BY J. HARRIS, MARCH 24, 2026
REFERRED TO COMMITTEE ON APPROPRIATIONS, MARCH 24, 2026
AN ACT
1 Providing for the capital budget for fiscal year 2026-2027;
2 itemizing public improvement projects, furniture and
3 equipment projects, transportation assistance, flood control
4 projects, Pennsylvania Fish and Boat Commission projects and
5 Manufacturing Fund projects leased or assisted by the
6 Department of General Services and other State agencies,
7 together with their estimated financial costs; authorizing
8 the incurring of debt without the approval of the electors
9 for the purpose of financing the projects to be constructed,
10 acquired or assisted by the Department of General Services
11 and other State agencies; authorizing the use of current
12 revenue for the purpose of financing the projects to be
13 constructed, acquired or assisted by the Department of
14 General Services and other State agencies stating the
15 estimated useful life of the projects; and making
16 appropriations.
17 The General Assembly of the Commonwealth of Pennsylvania
18 hereby enacts as follows:
19 Section 1. Short title.
20 This act shall be known and may be cited as the Capital
21 Budget Project Itemization Act of 2026-2027.
22 Section 2. Total authorizations.
23 (a) Public improvements.--The total authorization for the
24 additional capital projects in the category of public
25 improvement projects itemized in section 3 and to be acquired or
1 constructed by the Department of General Services, its
2 successors or assigns, and to be financed by the incurring of
3 debt shall be $32,314,071,000.
4 (b) Furniture and equipment.--The total authorization for
5 the additional capital projects in the category of public
6 improvement projects consisting of the acquisition of original
7 movable furniture and equipment to complete public improvement
8 projects itemized in section 4 and to be acquired by the
9 Department of General Services, its successors or assigns, and
10 to be financed by the incurring of debt shall be $917,194,000.
11 (c) Transportation assistance.--The total authorization for
12 the capital projects in the category of transportation
13 assistance projects itemized in section 5 with respect to which
14 an interest is to be acquired in or constructed by the
15 Department of Transportation, its successors or assigns and to
16 be financed by the incurring of debt shall be $2,597,000,000.
17 (d) (Reserved).
18 (e) Flood control.--The total authorization for the capital
19 projects in the category of flood control projects itemized in
20 section 7 and to be constructed by the Department of
21 Environmental Protection, its successors or assigns and to be
22 financed by the incurring of debt shall be $9,900,000.
23 (f) Fish Fund and Boat Fund.--The total authorization for
24 the capital projects in the category of public improvement
25 projects itemized in section 8 to be acquired or developed by
26 the Pennsylvania Fish and Boat Commission and to be financed by
27 the incurring of debt or by current revenues of the Fish Fund
28 and the Boat Fund pursuant to executive authorization shall be
29 $208,900,000.
30 (g) Manufacturing Fund.--The total authorization for the
20260HB2402PN3078 - 2 -
1 capital projects in the category of public improvement projects
2 itemized in section 9 to be acquired or developed by the
3 Department of Corrections and to be financed by current revenues
4 of the Manufacturing Fund pursuant to executive authorization
5 shall be $10,075,000.
6 (h) Critical infrastructure investment.--The total
7 authorization for the capital projects in the category of
8 critical infrastructure investment projects itemized in section
9 10 for capital grants by the Office of the Budget, its
10 successors or assigns and to be financed by the incurring of
11 debt shall be $1,000,000,000.
12 Section 3. Itemization of public improvement capital projects.
13 Additional capital projects in the category of public
14 improvement projects to be acquired or constructed by the
15 Department of General Services, its successors or assigns, and
16 to be financed by the incurring of debt, are hereby itemized,
17 together with their respective estimated financial costs, as
18 follows:
19 Total Project
20 Project Allocation
21 (1) Department of Agriculture
22 (i) Pennsylvania State University College of
23 Agricultural Sciences, Centre County
24 (A) Plant Science Facility to allow for
25 cross-disciplinary innovation and
26 research, including research facility,
27 greenhouse, headhouse and climate-
28 controlled plant production features
29 Project Allocation 50,000,000
30 (B) Animal Diagnostic Laboratory
20260HB2402PN3078 - 3 -
1 Construction, alterations,
2 renovations, site improvements,
3 infrastructure upgrades and land
4 acquisition
5 Project Allocation 25,000,000
6 (ii) Livestock Evaluation Center, Centre
7 County
8 (A) Construction, alterations,
9 renovations, site improvements and
10 infrastructure upgrades
11 Project Allocation 20,000,000
12 (iii) New Bolton Center, Chester County
13 (A) Construction of Pennsylvania Equine
14 Toxicology and Research Laboratory on
15 New Bolton Campus of The University of
16 Pennsylvania
17 Project Allocation 25,000,000
18 (iv) Annex, Dauphin County
19 (A) New construction, alterations,
20 renovations, site improvements,
21 infrastructure upgrades and land
22 acquisition
23 Project Allocation 15,000,000
24 (v) Farm Show Complex, Dauphin County
25 (A) Construction, alterations,
26 renovations, site improvements and
27 infrastructure upgrades
28 Project Allocation 50,000,000
29 (vi) Headquarters, Veterinary Laboratory and
30 Farm Show Complex, Dauphin County
20260HB2402PN3078 - 4 -
1 (A) Upgrade security system and cameras
2 Project Allocation 20,000,000
3 (vii) Entomology Laboratory, Dauphin County
4 (A) New construction, alterations,
5 renovations, site improvements,
6 infrastructure upgrades and land
7 acquisition
8 Project Allocation 10,000,000
9 (viii) Greenhouse and Nematology Laboratory,
10 Dauphin County
11 (A) New construction, alterations,
12 renovations, site improvements,
13 infrastructure upgrades and land
14 acquisition
15 Project Allocation 15,000,000
16 (ix) Animal Health Diagnostic Laboratory
17 (A) Renovations, additions and
18 construction, including site and
19 infrastructure improvements for design
20 and construction to satisfy modern
21 testing procedures
22 Project Allocation 75,500,000
23 (x) Headquarters, Department of Agriculture,
24 Dauphin County
25 (A) Renovations, additions and
26 construction, including site and
27 infrastructure improvements
28 Project Allocation 25,000,000
29 (2) Department of Conservation and Natural
30 Resources
20260HB2402PN3078 - 5 -
1 (i) Point State Park, Allegheny County
2 (A) Portal bridge replacement and park
3 sidewalk rehabilitation and ADA
4 improvements
5 Project Allocation 6,000,000
6 (B) Construct new parking facilities,
7 park office, rehabilitate flag bastion
8 area and install solar arrays
9 Project Allocation 25,000,000
10 (ii) Raccoon Creek State Park, Beaver County
11 (A) Park improvements
12 Project Allocation 12,500,000
13 (iii) Blue Knob State Park, Bedford County
14 (A) Rehabilitation of Blue Knob Ski area,
15 including improved facilities,
16 parking, roadway and viewscapes to
17 promote year-round recreation
18 Project Allocation 25,000,000
19 (iv) French Creek State Park, Berks County
20 (A) Park improvements
21 Project Allocation 25,000,000
22 (v) Delaware Canal State Park, Bucks County
23 (A) Visitor center, park office and site
24 rehabilitation
25 Project Allocation 37,500,000
26 (B) Replacement of 12 adjacent box beam
27 bridges along Delaware Canal
28 Project Allocation 6,000,000
29 (vi) Moraine State Park, Butler County
30 (A) Park improvements
20260HB2402PN3078 - 6 -
1 Project Allocation 45,000,000
2 (vii) Gallitzin State Forest, Cambria County
3 (A) Construct new district office
4 Project Allocation 23,000,000
5 (viii) Prince Gallitzin State Park, Cambria
6 County
7 (A) Park improvements
8 Project Allocation 12,500,000
9 (ix) Lehigh Gorge State Park, Carbon County
10 (A) Design and build the trail system at
11 Glen Onoko
12 Project Allocation 7,000,000
13 (x) Elk State Forest, Cameron County
14 (A) Replace Brooks Run forest maintenance
15 headquarters and storage building
16 Project Allocation 4,000,000
17 (B) Hicks Run Forest maintenance
18 headquarters and five-bay pole
19 building
20 Project Allocation 1,250,000
21 (xi) Hickory Run State Park, Carbon County
22 (A) Park improvements
23 Project Allocation 25,000,000
24 (xii) Black Moshannon State Park, Centre
25 County
26 (A) Park improvements
27 Project Allocation 12,500,000
28 (xiii) Forest Fire Protection, Centre County
29 (A) Construct new regional air operations
30 facility
20260HB2402PN3078 - 7 -
1 Project Allocation 10,000,000
2 (xiv) Mira Lloyd Dock Conservation Center,
3 Centre County
4 (A) Repairs to Penn Nursery Dam or Breach
5 Dam and construct alternative water
6 supply for irrigation system
7 Project Allocation 5,000,000
8 (xv) Penn Nursery, Centre County
9 (A) Construct new seed extraction
10 building
11 Project Allocation 6,300,000
12 (xvi) Sproul State Forest, Centre County
13 (A) Replace Snowshoe maintenance
14 headquarters
15 Project Allocation 4,500,000
16 (xvii) Big Elk Creek State Park, Chester
17 County
18 (A) State park development phase 2 and
19 land acquisition
20 Project Allocation 19,000,000
21 (xviii) Parker Dam State Park, Clearfield
22 County
23 (A) Dam repairs and lake dredging
24 Project Allocation 37,500,000
25 (xix) Moshannon State Forest, Clearfield
26 County
27 (A) Demolish Dague Mechanics Shop and
28 replace with modern mechanics shop
29 Project Allocation 2,500,000
30 (B) Repairs to Shaggers Inn Dam
20260HB2402PN3078 - 8 -
1 Project Allocation 11,000,000
2 (xx) Bald Eagle State Forest, Clinton County
3 (A) Construct new wood shop, groomer
4 storage and pole storage building
5 Project Allocation 5,625,000
6 (xxi) Pymatuning State Park, Crawford County
7 (A) Park improvements
8 Project Allocation 25,000,000
9 (B) Rehabilitate State Park campground
10 facilities
11 Project Allocation 2,000,000
12 (xxii) Forestry Lab, Dauphin County
13 (A) Construction of new laboratory,
14 including site and infrastructure
15 improvements and land acquisition
16 Project Allocation 40,000,000
17 (xxiii) Geologic Survey Headquarters, Dauphin
18 County
19 (A) Construct a new headquarters building
20 for the Bureau of Geologic Survey
21 Project Allocation 30,000,000
22 (xxiv) Ridley Creek State Park, Delaware
23 County
24 (A) Park improvements
25 Project Allocation 25,000,000
26 (xxv) Presque Isle State Park, Erie County
27 (A) Sand nourishment
28 Project Allocation 25,000,000
29 (B) Dune replacement and resource work
30 Project Allocation 12,500,000
20260HB2402PN3078 - 9 -
1 (C) Roads and multipurpose trail
2 rehabilitation
3 Project Allocation 8,750,000
4 (D) Park improvements
5 Project Allocation 25,000,000
6 (xxvi) Laurel Caverns, Fayette County
7 (A) Development of day-use, visitor
8 center and overnight facilities
9 Project Allocation 30,000,000
10 (xxvii) Cornplanter State Park, Forest County
11 (A) Construct new resource management
12 center and storage building
13 Project Allocation 17,000,000
14 (xxviii) Michaux State Forest, Franklin
15 County
16 (A) Construct resource management center
17 and storage building
18 Project Allocation 30,000,000
19 (xxix) Buchanan State Forest, Fulton County
20 (A) Replace Sideling Hill maintenance
21 headquarters and mechanics shop
22 Project Allocation 3,600,000
23 (xxx) Cowans Gap State Park, Fulton County
24 (A) Rehabilitate Cowans Gap Dam
25 Project Allocation 9,000,000
26 (B) Construct park office and visitor
27 center
28 Project Allocation 6,000,000
29 (xxxi) Ryerson Station State Park, Greene
30 County
20260HB2402PN3078 - 10 -
1 (A) Resource and recreation improvements
2 Phase 2
3 Project Allocation 12,500,000
4 (B) Improvements to Ryerson Station State
5 Park - dam removal
6 Project Allocation 4,000,000
7 (xxxii) Yellow Creek State Park, Indiana
8 County
9 (A) Day use rehabilitation
10 Project Allocation 7,500,000
11 (xxxiii) Clear Creek State Forest, Jefferson
12 County
13 (A) New maintenance shop and equipment
14 storage
15 Project Allocation 3,500,000
16 (xxxiv) Pinchot State Forest, Lackawanna
17 County
18 (A) Breach and remove Edgerton Dam
19 Project Allocation 3,000,000
20 (B) Breach and remove Olyphant Dam No. 3
21 Project Allocation 3,000,000
22 (xxxv) Memorial Lake State Park, Lebanon
23 County
24 (A) Rehabilitate dam
25 Project Allocation 17,000,000
26 (xxxvi) Forest Fire Protection, Luzerne
27 County
28 (A) Rebuild Hazelton Air Operations
29 building, including site improvements
30 Project Allocation 5,000,000
20260HB2402PN3078 - 11 -
1 (xxxvii) Pinchot State Forest, Luzerne County
2 (A) Construct Pinchot forest district
3 resource management center complex
4 Project Allocation 25,000,000
5 (xxxviii) Tiadaghton State Forest, Lycoming
6 County
7 (A) Construct new Waterville mechanics
8 garage and storage
9 Project Allocation 5,000,000
10 (xxxix) Maurice K. Goddard State Park, Mercer
11 County
12 (A) Redevelopment of park facilities
13 Project Allocation 8,500,000
14 (xl) Tuscarora State Forest, Mifflin County
15 (A) Replace East Licking Creek forest
16 maintenance headquarters
17 Project Allocation 5,750,000
18 (xli) Norristown Farm Park, Montgomery County
19 (A) Replace multiple vehicular and
20 pedestrian bridges
21 Project Allocation 12,000,000
22 (B) Transportation infrastructure and
23 bridges
24 Project Allocation 25,000,000
25 (xlii) Shikellamy State Park, Northumberland
26 County
27 (A) Full replacement of dam and permanent
28 causeway
29 Project Allocation 60,000,000
30 (xliii) Delaware State Forest, Pike County
20260HB2402PN3078 - 12 -
1 (A) Lilly Pond Dam spillway repair and
2 replacement
3 Project Allocation 11,000,000
4 (xliv) Denton Hill State Park, Potter County
5 (A) Upgrade, rehabilitation or
6 replacement of ski lift, lighting,
7 equipment, parking and structures to
8 improve operations, recreation and
9 public safety
10 Project Allocation 37,500,000
11 (xlv) Gallitzin State Forest, Somerset County
12 (A) Raze and replace the Babcock Forest
13 maintenance headquarters and storage
14 building
15 Project Allocation 5,625,000
16 (xlvi) Kooser State Park, Somerset County
17 (A) Day use and dam rehabilitation
18 Project Allocation 12,000,000
19 (xlvii) Laurel Hill State Park, Somerset
20 County
21 (A) Park improvements
22 Project Allocation 25,000,000
23 (xlviii) Loyalsock State Forest, Sullivan
24 County
25 (A) Resource management rehabilitation or
26 replacement
27 Project Allocation 2,000,000
28 (xlix) Leonard Harrison State Park, Tioga
29 County
30 (A) Turkey Path Trail rehabilitation and
20260HB2402PN3078 - 13 -
1 realignment
2 Project Allocation 4,500,000
3 (l) Tioga State Forest, Tioga County
4 (A) Construct new maintenance
5 headquarters
6 Project Allocation 3,750,000
7 (B) Construct new resource management
8 center
9 Project Allocation 40,000,000
10 (li) Vosburg Neck State Park, Wyoming County
11 (A) State park development and land
12 acquisition Phase 2
13 Project Allocation 19,000,000
14 (lii) Susquehanna Riverlands State Park, York
15 County
16 (A) State park development and land
17 acquisition Phase 2
18 Project Allocation 32,000,000
19 (liii) Forestry - Statewide
20 (A) Dam rehabilitation or removal at
21 various impoundments
22 Project Allocation 60,000,000
23 (liv) State Parks - Statewide
24 (A) Upgrades and improvements to
25 campground washhouses, utilities, site
26 work and other amenities, including
27 new construction, renovations and
28 alterations
29 Project Allocation 37,500,000
30 (B) Provide additional funding for the
20260HB2402PN3078 - 14 -
1 dredging and removal of various lakes
2 Project Allocation 25,000,000
3 (C) Upgrades and improvements of
4 campground washhouses, utilities, site
5 work and other amenities
6 Project Allocation 37,500,000
7 (D) Rehabilitate historic structures
8 Project Allocation 14,000,000
9 (E) Critical regulatory system repairs
10 and replacements at multiple water and
11 wastewater treatment plants
12 Project Allocation 37,500,000
13 (F) New construction, renovations and
14 alterations at roofed overnight
15 colonies, including improvements to
16 supporting infrastructure at multiple
17 locations
18 Project Allocation 7,000,000
19 (G) Improvements to training academy
20 infrastructure and range
21 Project Allocation 50,000,000
22 (H) Dam rehabilitation, lake dredging and
23 various dam impoundments
24 Project Allocation 95,000,000
25 (I) Replacement and rehabilitation of
26 multiple maintenance facilities
27 Project Allocation 12,500,000
28 (3) Department of Corrections
29 (i) State Correctional Institution at Benner,
30 Centre County
20260HB2402PN3078 - 15 -
1 (A) Design and construction of building
2 expansion, new construction,
3 renovations and alterations, including
4 upgrade of utilities and related
5 infrastructure, land development and
6 site infrastructure improvements
7 Project Allocation 42,413,000
8 (ii) State Correctional Institution at
9 Rockview, Centre County
10 (A) Design and construction of building
11 decommissioning, utility separation
12 and site work in preparation of
13 demolition
14 Project Allocation 10,000,000
15 (iii) State Correctional Institution at
16 Houtzdale, Clearfield County
17 (A) Design and construction of building
18 expansion, new construction,
19 renovations and alterations, including
20 upgrade of utilities and related
21 infrastructure, land development and
22 site infrastructure improvements
23 Project Allocation 35,590,000
24 (iv) State Correctional Institution at
25 Cambridge Springs, Crawford County
26 (A) Design and construction of building
27 expansion, new construction,
28 renovations and alterations, including
29 upgrade of utilities and related
30 infrastructure, land development and
20260HB2402PN3078 - 16 -
1 site infrastructure improvements
2 Project Allocation 31,504,000
3 (v) State Correctional Institution at Camp
4 Hill, Cumberland County
5 (A) Design and construction of building
6 expansion, new construction,
7 renovations and alterations, including
8 upgrade of utilities and related
9 infrastructure, land development and
10 site infrastructure improvements
11 Project Allocation 378,460,000
12 (vi) State Correctional Institution at
13 Chester, Delaware County
14 (A) Design and construction of building
15 expansion, new construction,
16 renovations and alterations, including
17 upgrade of utilities and related
18 infrastructure, land development and
19 site infrastructure improvements
20 Project Allocation 29,575,000
21 (vii) State Correctional Institution at
22 Albion, Erie County
23 (A) Design and construction of building
24 expansion, new construction,
25 renovations and alterations, including
26 upgrade of utilities and related
27 infrastructure, land development and
28 site infrastructure improvements
29 Project Allocation 35,877,000
30 (viii) State Correctional Institution at
20260HB2402PN3078 - 17 -
1 Fayette, Fayette County
2 (A) Design and construction of building
3 expansion, new construction,
4 renovations and alterations, including
5 upgrade of utilities and related
6 infrastructure, land development and
7 site infrastructure improvements
8 Project Allocation 16,177,000
9 (ix) State Correctional Institution at
10 Forest, Forest County
11 (A) Design and construction of building
12 expansion, new construction,
13 renovations and alterations, including
14 upgrade of utilities and related
15 infrastructure, land development and
16 site infrastructure improvements
17 Project Allocation 75,113,000
18 (x) State Correctional Institution at Greene,
19 Greene County
20 (A) Design and construction of building
21 expansion, new construction,
22 renovations and alterations, including
23 upgrade of utilities and related
24 infrastructure, land development and
25 site infrastructure improvements
26 Project Allocation 36,180,000
27 (xi) State Correctional Institution at
28 Huntingdon, Huntingdon County
29 (A) Design and construction of building
30 expansion, new construction,
20260HB2402PN3078 - 18 -
1 renovations and alterations, including
2 upgrade of utilities and related
3 infrastructure, land development and
4 site infrastructure improvements
5 Project Allocation 34,932,000
6 (xii) State Correctional Institution at
7 Smithfield, Huntingdon County
8 (A) Design and construction of building
9 expansion, new construction,
10 renovations and alterations, including
11 upgrade of utilities and related
12 infrastructure, land development and
13 site infrastructure improvements
14 Project Allocation 27,976,000
15 (xiii) State Correctional Institution at Pine
16 Grove, Indiana County
17 (A) Design and construction of building
18 expansion, new construction,
19 renovations and alterations, including
20 upgrade of utilities and related
21 infrastructure, land development and
22 site infrastructure improvements
23 Project Allocation 75,761,000
24 (xiv) Elizabethtown Training Facility,
25 Lancaster County
26 (A) Design and construction of building
27 expansion, new construction,
28 renovations and alterations, including
29 upgrade of utilities and related
30 infrastructure, land development and
20260HB2402PN3078 - 19 -
1 site infrastructure improvements
2 Project Allocation 778,977,000
3 (xv) State Correctional Institution at
4 Dallas, Luzerne County
5 (A) Design and construction of building
6 expansion, new construction,
7 renovations and alterations, including
8 upgrade of utilities and related
9 infrastructure, land development and
10 site infrastructure improvements
11 Project Allocation 37,750,000
12 (xvi) State Correctional Institution at
13 Muncy, Lycoming County
14 (A) Design and construction of building
15 expansion, new construction,
16 renovations and alterations, including
17 upgrade of utilities and related
18 infrastructure, land development and
19 site infrastructure improvements
20 Project Allocation 127,144,000
21 (xvii) State Correctional Institution at
22 Mercer, Mercer County
23 (A) Design and construction of building
24 expansion, new construction,
25 renovations and alterations, including
26 upgrade of utilities and related
27 infrastructure, land development and
28 site infrastructure improvements
29 Project Allocation 34,837,000
30 (xviii) State Correctional Institution at
20260HB2402PN3078 - 20 -
1 Graterford, Montgomery County
2 (A) Demolition of facility, including
3 code, permit, site, utility and
4 infrastructure-related issues
5 Project Allocation 99,723,000
6 (xix) State Correctional Institution at
7 Phoenix, Montgomery County
8 (A) Design and construction of building
9 expansion, new construction,
10 renovations and alterations, including
11 upgrade of utilities and related
12 infrastructure, land development and
13 site infrastructure improvements
14 Project Allocation 24,826,000
15 (xx) State Correctional Institution at Coal
16 Township, Northumberland County
17 (A) Design and construction of building
18 expansion, new construction,
19 renovations and alterations, including
20 upgrade of utilities and related
21 infrastructure, land development and
22 site infrastructure improvements
23 Project Allocation 46,239,000
24 (xxi) State Correctional Institution at
25 Frackville, Schuylkill County
26 (A) Design and construction of building
27 expansion, new construction,
28 renovations and alterations, including
29 upgrade of utilities and related
30 infrastructure, land development and
20260HB2402PN3078 - 21 -
1 site infrastructure improvements
2 Project Allocation 72,244,000
3 (xxii) State Correctional Institution at
4 Mahanoy, Schuylkill County
5 (A) Design and construction of building
6 expansion, new construction,
7 renovations and alterations, including
8 upgrade of utilities and related
9 infrastructure, land development and
10 site infrastructure improvements
11 Project Allocation 68,786,000
12 (xxiii) State Correctional Institution at
13 Laurel Highlands, Somerset County
14 (A) Design and construction of building
15 expansion, new construction,
16 renovations and alterations, including
17 upgrade of utilities and related
18 infrastructure, land development and
19 site infrastructure improvements
20 Project Allocation 42,471,000
21 (xxiv) State Correctional Institution at
22 Somerset, Somerset County
23 (A) Design and construction of building
24 expansion, new construction,
25 renovations and alterations, including
26 upgrade of utilities and related
27 infrastructure, land development and
28 site infrastructure improvements
29 Project Allocation 48,949,000
30 (xxv) State Correctional Institution at
20260HB2402PN3078 - 22 -
1 Waymart, Wayne County
2 (A) Design and construction of building
3 expansion, new construction,
4 renovations and alterations, including
5 upgrade of utilities and related
6 infrastructure, land development and
7 site infrastructure improvements
8 Project Allocation 63,028,000
9 (4) Department of Education
10 (i) Department of Education Headquarters
11 (Reserved)
12 (ii) University of Pittsburgh
13 (A) Building to connect the multiple mid-
14 campus buildings - Oakland Campus,
15 Allegheny County. Renovation, new
16 construction and alterations,
17 including land development and site
18 infrastructure improvements
19 Project Allocation 300,000,000
20 (B) Campuswide programmatic and
21 infrastructure upgrades to buildings -
22 Oakland Campus, Allegheny County. This
23 project will provide modern facilities
24 for teaching, research, office and
25 support that meet today's building
26 codes, energy-efficient systems and
27 accommodations for special needs
28 students, faculty and staff
29 Project Allocation 100,000,000
30 (C) Existing apartment building or hotel
20260HB2402PN3078 - 23 -
1 for student housing - Oakland Campus,
2 Allegheny County. Purchase and
3 renovation of existing apartment
4 building or hotel in the Oakland area
5 for student housing
6 Project Allocation 180,000,000
7 (D) Former PAA building - Oakland Campus,
8 Allegheny County. Renovation of the
9 former PAA Building
10 Project Allocation 180,000,000
11 (E) New laboratory and classroom building
12 - Oakland Campus, Allegheny County.
13 Renovation, new construction and
14 alterations, including land
15 development and site infrastructure
16 improvements
17 Project Allocation 480,000,000
18 (F) Old Engineering Hall - Oakland
19 Campus, Allegheny County. Renovation,
20 new construction and alterations,
21 including land development and site
22 infrastructure improvements
23 Project Allocation 480,000,000
24 (G) Parking garages - Oakland Campus,
25 Allegheny County. Renovation, new
26 construction and alterations,
27 including land development and site
28 infrastructure improvements
29 Project Allocation 60,000,000
30 (H) New residence hall - Oakland Campus,
20260HB2402PN3078 - 24 -
1 Allegheny County. Renovation, new
2 construction and alterations,
3 including land development and site
4 infrastructure improvements
5 Project Allocation 132,000,000
6 (I) Space Research Coordination Center
7 (SRCC) building - Oakland Campus,
8 Allegheny County. Renovation, new
9 construction and alterations,
10 including land development and site
11 infrastructure improvements
12 Project Allocation 480,000,000
13 (J) Fitzgerald Fieldhouse - Oakland
14 Campus, Allegheny County. Renovation,
15 new construction and alterations,
16 including land development and site
17 infrastructure improvements
18 Project Allocation 240,000,000
19 (K) New indoor track and band facility -
20 Oakland Campus, Allegheny County. New
21 construction, including land
22 development, site acquisition and site
23 infrastructure improvements
24 Project Allocation 180,000,000
25 (L) New multisport athletic and
26 entertainment facility - Oakland
27 Campus, Allegheny County. New
28 construction, including land
29 development, site acquisition and site
30 infrastructure improvements, including
20260HB2402PN3078 - 25 -
1 extension of utilities
2 Project Allocation 780,000,000
3 (M) One Bigelow Academic Teaching and
4 Research Complex - Oakland Campus,
5 Allegheny County. New construction,
6 including land development, site
7 acquisition and site infrastructure
8 improvements
9 Project Allocation 480,000,000
10 (N) New School of Dental Medicine
11 building - Oakland Campus, Allegheny
12 County. New construction, including
13 land development, site acquisition and
14 site infrastructure improvements
15 Project Allocation 240,000,000
16 (O) New School of Nursing building -
17 Oakland Campus, Allegheny County. New
18 construction, including land
19 development, site acquisition and site
20 infrastructure improvements
21 Project Allocation 240,000,000
22 (P) New Student Union building - Oakland
23 Campus, Allegheny County. New
24 construction, including land
25 development, site acquisition and site
26 infrastructure improvements
27 Project Allocation 240,000,000
28 (Q) Trees Hall - Oakland Campus,
29 Allegheny County. Renovation, new
30 construction, alterations, land
20260HB2402PN3078 - 26 -
1 development, site infrastructure
2 improvements, including improvements
3 to meet current building codes and
4 ADA, mechanical, electrical and fire
5 protection systems upgrades
6 Project Allocation 200,000,000
7 (R) Twentieth Century Club building -
8 Oakland Campus, Allegheny County.
9 Renovation, new construction,
10 alterations, land development, site
11 infrastructure improvement, including
12 improvements to meet current building
13 codes and ADA, mechanical, electrical
14 and fire protection systems upgrades
15 Project Allocation 100,000,000
16 (S) Western Psychiatric Hospital and
17 Clinic (WPIC) parking garage - Oakland
18 Campus, Allegheny County. Renovation,
19 new construction, alterations, land
20 development and site infrastructure
21 improvement, including improvements to
22 meet current building codes and ADA
23 Project Allocation 100,000,000
24 (T) William Pitt Union Building - Oakland
25 Campus, Allegheny County. Renovate the
26 175,000-square-foot, historic 1897
27 William Pitt Student Union, with the
28 lower levels to continue its assembly
29 use and the upper floors to undergo a
30 renovation and repurpose as a Student
20260HB2402PN3078 - 27 -
1 Residence Hall. This project includes
2 infrastructure, utilities, ADA and
3 egress upgrades needed to support the
4 residence hall
5 Project Allocation 180,000,000
6 (U) Trees Hall Basketball Practice
7 Facility - Oakland Campus, Allegheny
8 County. This project will renovate the
9 east wing of existing 1961 Trees Hall
10 for the men's and women's practice
11 basketball space, inclusive of a Hall
12 of Fame entry, courts, locker rooms,
13 training areas and coaches' offices
14 Project Allocation 36,000,000
15 (V) Gardner Steel, O'Hara Student Center
16 and new connecting building - Oakland
17 Campus, Allegheny County. This project
18 will renovate and repurpose the
19 existing 1912 Gardner Steel Conference
20 Center and 1913 O'Hara Student Center
21 and construct a connecting building in
22 the complex for Student Commons,
23 Teaching Laboratories, classrooms,
24 conference space and offices
25 Project Allocation 180,000,000
26 (W) Public Realm Improvements - Oakland
27 Campus, Allegheny County. The 2025
28 University Campus Master Plan proposes
29 improvements to existing plazas
30 (Barco, Litchfield, Posvar, etc). This
20260HB2402PN3078 - 28 -
1 project will span the campus and
2 upgrade accessibility and wayfinding
3 across the Oakland Campus,
4 constructing new elevators, ramps,
5 stairs and outdoor campus amenities.
6 Project Allocation 90,000,000
7 (X) Litchfield Towers - Oakland Campus,
8 Allegheny County. This project will
9 renovate Litchfield Towers and
10 construct an addition to improve the
11 ground level experience and legibility
12 of the building
13 Project Allocation 60,000,000
14 (Y) Parking garage - Oakland Campus,
15 Allegheny County. Pitt's Oakland
16 Campus has a current shortfall of more
17 than 250 parking spaces. This project
18 will construct a parking structure
19 with multimodal hub components,
20 including EV chargers and bicycle
21 storage for campus commuters and
22 visitors
23 Project Allocation 60,000,000
24 (Z) AI Research and Teaching Complex -
25 Oakland Campus, Allegheny County. This
26 project will advance the university's
27 initiatives in Artificial
28 Intelligence, life sciences and
29 biomedical engineering by constructing
30 a new research and office building,
20260HB2402PN3078 - 29 -
1 including collaborating space for
2 interdisciplinary advancement of
3 approximately 200,000 square feet on
4 Oakland campus
5 Project Allocation 300,000,000
6 (AA) School of Medicine and Health
7 Sciences Modernization and
8 Consolidation - Oakland Campus,
9 Allegheny County. The university
10 School of Medicine will consolidate
11 research offices and laboratories in
12 off-campus leased space into
13 university-owned buildings on the
14 Oakland campus. This project will
15 renovate existing space to receive the
16 returning departments, including
17 improving and upgrading the support
18 infrastructure needed for fully
19 functioning systems and improved,
20 efficient laboratory and office space
21 Project Allocation 500,000,000
22 (BB) Bellefield Hall - Oakland Campus,
23 Allegheny County. This project will
24 renovate the existing 112,000 square
25 foot circa 1925 Bellefield Hall for
26 student academic and support spaces,
27 studio and practice rooms, academic
28 offices and assembly spaces, along
29 with the infrastructure improvements
30 needed to support the programs
20260HB2402PN3078 - 30 -
1 Project Allocation 60,000,000
2 (CC) Programmatic and Infrastructure
3 Upgrades - Bradford Campus, McKean
4 County. This project will provide
5 modern facilities for teaching,
6 research, office and support which
7 meet today's building codes, energy-
8 efficient systems and accommodations
9 for special needs students, facility
10 and staff
11 Project Allocation 24,000,000
12 (DD) Programmatic and Infrastructure
13 Upgrades - Greensburg Campus,
14 Westmoreland County. This project will
15 provide modern facilities for
16 teaching, research, office and support
17 which meet today's building codes,
18 energy-efficient systems and
19 accommodations for special needs
20 students, facility and staff
21 Project Allocation 24,000,000
22 (EE) Programmatic and Infrastructure
23 Upgrades - Johnstown Campus, Cambria
24 County. This project will provide
25 modern facilities for teaching,
26 research, office and support which
27 meet today's building codes, energy-
28 efficient systems and accommodations
29 for special needs students, facility
30 and staff
20260HB2402PN3078 - 31 -
1 Project Allocation 24,000,000
2 (FF) Programmatic and Infrastructure
3 Upgrades - Titusville Campus, Cambria
4 County. This project will provide
5 modern facilities for teaching,
6 research, office and support which
7 meet today's building codes, energy-
8 efficient systems and accommodations
9 for special needs students, facility
10 and staff
11 Project Allocation 24,000,000
12 (iii) The Pennsylvania State University
13 (A) Atherton Street Steam Line Crossing -
14 University Park, Centre County.
15 Design, construction (new space or
16 addition to and/or renovation of
17 existing space, including demolition,
18 abatement of hazardous materials,
19 extensions and/or upgrading of
20 utilities and other infrastructure
21 needs) and other related costs for the
22 Atherton Street Steam Line Crossing at
23 Penn State University Park. This
24 project involves the installation of a
25 new steam line that traverses Atherton
26 Street and will connect West Campus
27 with the central steam system. Funding
28 will be used for both design and
29 construction costs, as well as
30 necessary utility upgrades and
20260HB2402PN3078 - 32 -
1 extensions, site improvements and
2 code-related upgrades. All costs for
3 both occupant and program relocation
4 or interim facilities will be
5 included. The construction will both
6 meet all current building code
7 requirements and provide for barrier-
8 free access as required by the
9 Americans with Disabilities Act and
10 related codes
11 Project Allocation 15,000,000
12 (B) Chiller unit - University Park,
13 Centre County. Design, construction
14 (new space or addition to and/or
15 renovation of existing space,
16 including demolition, abatement of
17 hazardous materials, extensions and/or
18 upgrading of utilities and other
19 infrastructure needs) and other
20 related costs for a chiller unit at
21 Penn State University Park. This
22 chiller unit will replace an existing,
23 smaller chiller unit which will delay
24 the need of a new chilled water plant.
25 Funding will be used for both design
26 and construction costs, as well as
27 necessary utility upgrades and
28 extensions, site improvements and
29 code-related upgrades. All costs for
30 both occupant and program relocation
20260HB2402PN3078 - 33 -
1 or interim facilities will be
2 included. The construction will both
3 meet all current building code
4 requirements and provide for barrier-
5 free access as required by the
6 Americans with Disabilities Act and
7 related codes
8 Project Allocation 25,000,000
9 (C) Demolition program - University Park,
10 Centre County. Additional funding for
11 the design, construction (new space or
12 addition to and/or renovation of
13 existing space, including demolition,
14 abatement of hazardous materials,
15 extensions and/or upgrading of
16 utilities and other infrastructure
17 needs) and other related costs for the
18 Demolition Program at Penn State
19 University Park. This project involves
20 the demolition of campus facilities.
21 Funding will be used for both design
22 and construction costs, as well as
23 necessary utility upgrades and
24 extensions, site improvements and
25 code-related upgrades. All costs for
26 both occupant and program relocation
27 or interim facilities will be
28 included. The construction will both
29 meet all current building code
30 requirements and provide for barrier-
20260HB2402PN3078 - 34 -
1 free access as required by the
2 Americans with Disabilities Act and
3 related codes
4 Project Allocation 20,000,000
5 (D) Eisenhower Auditorium Renovation -
6 University Park, Centre County.
7 Additional funding for the design,
8 construction (new space or addition to
9 and/or renovation of existing space,
10 including demolition, abatement of
11 hazardous materials, extensions and/or
12 upgrading of utilities and other
13 infrastructure needs) and other
14 related costs for the Eisenhower
15 Auditorium at Penn State University
16 Park. This project will renovate the
17 building in order to provide a
18 modernized facility that adequately
19 supports the instructional and public
20 performance functions of this campus.
21 Funding will be used for both design
22 and construction costs, as well as
23 necessary utility upgrades and
24 extensions, site improvements and
25 code-related upgrades. All costs for
26 both occupant and program relocation
27 or interim facilities will be
28 included. The construction will both
29 meet all current building code
30 requirements and provide for barrier-
20260HB2402PN3078 - 35 -
1 free access as required by the
2 Americans with Disabilities Act and
3 related codes
4 Project Allocation 45,000,000
5 (E) Electrical interconnection work -
6 University Park, Centre County.
7 Design, construction (new space or
8 addition to and/or renovation of
9 existing space, including demolition,
10 abatement of hazardous materials,
11 extensions and/or upgrading of
12 utilities and other infrastructure
13 needs) and other related costs for
14 electrical interconnection work at
15 Penn State University Park. This
16 project will provide a new high-
17 voltage, electrical interconnection
18 between electrical substations to
19 provide a single electrical
20 distribution network. Funding will be
21 used for both design and construction
22 costs, as well as necessary utility
23 upgrades and extensions, site
24 improvements and code-related
25 upgrades. All costs for both occupant
26 and program relocation or interim
27 facilities will be included. The
28 construction will both meet all
29 current building code requirements and
30 provide for barrier-free access as
20260HB2402PN3078 - 36 -
1 required by the Americans with
2 Disabilities Act and related codes.
3 Project Allocation 30,000,000
4 (F) Former Palmer Museum of Art -
5 University Park, Centre County.
6 Design, construction (new space or
7 addition to and/or renovation of
8 existing space, including demolition,
9 abatement of hazardous materials,
10 extensions and/or upgrading of
11 utilities and other infrastructure
12 needs) and other related costs for the
13 Former Palmer Museum of Art at Penn
14 State University Park. The general
15 project scope is to renew the
16 originally constructed 1971 and 1990
17 buildings to meet the new program
18 which includes both general purpose
19 classrooms and College of Arts and
20 Architecture support spaces. Funding
21 will be used for both design and
22 construction costs, as well as
23 necessary utility upgrades and
24 extensions, site improvements and
25 code-related upgrades. All costs for
26 both occupant and program relocation
27 or interim facilities will be
28 included. The construction will both
29 meet all current building code
30 requirements and provide for barrier-
20260HB2402PN3078 - 37 -
1 free access as required by the
2 Americans with Disabilities Act and
3 related codes.
4 Project Allocation 50,000,000
5 (G) FRONTIER (Forging a Renaissance of
6 Nuclear Through Innovation,
7 Entrepreneurship, and Research)
8 University Park, Centre County.
9 Design, construc
… [truncated — open the source document for the complete text]Connected on the graph
Outbound (1)
| date | type | to | amount | role | source |
|---|---|---|---|---|---|
| — | referred_to_committee | Pennsylvania House Appropriations Committee | — | pa-leg |
The full graph
Every typed relationship touching this entity — 1 edge across 1 category. Grouped by what the connection is; the heaviest few are shown, with a link to the full list.
Committees
→ Referred to committee 1 edge
Who matters
Members ranked by combined influence on this bill: role (sponsor 5 / cosponsor 1), capped speech count from the Congressional Record, and recorded-vote engagement.
| # | Member | Role | Speeches | Voted | Score |
|---|---|---|---|---|---|
| 1 | Jordan A. Harris (D, state_lower PA-186) | sponsor | 0 | — | 5 |
Predicted vote
Aggregated from: actual roll-call votes (when present) → sponsor → cosponsor → party median (predicts YES when ≥25% of the caucus sponsored/cosponsored). Each row labels its confidence tier so you can see why a position was predicted.
0 predicted yes (0%) · 543 predicted no (100%) · 0 unknown (0%)
By party: · R: 0 yes / 277 no · D: 0 yes / 263 no · I: 0 yes / 3 no
Activity
Every typed-graph event involving this entity, newest first. Each row is one edge in the influence graph; click the date to jump to its provenance.
- 2026-05-20 · was referred to Pennsylvania House Appropriations Committee · pa-leg